Load, structure and interconnection study (sample)
A 500 kW industrial array
The upper end of the company's published range: a 500 kW array planned around a large daytime industrial load.

The challenge
The brief is a sample: a factory, warehouse or similar site with a large daytime load, extensive roof or ground area, and the electrical complexity that comes with a system at the top of a 3–500 kW range. Structure, transformer capacity, phasing of the install and shutdown windows all had to be designed, not guessed.
The solution
A 500 kW on-grid array was specified as the upper published capacity G&G Associates installs. Work would typically be staged so the plant can keep running, with interconnection planned against the site's existing electrical infrastructure. No residential CFA is assumed at this scale.
Results
The generation and savings figures below are order-of-magnitude estimates for a 500 kW daytime-load system, not measured output from a named plant. They must be replaced with real, consented figures before this case study is used in campaigns.
System capacity (sample)
Monthly generation (estimate)
Savings (estimate)
Timeline
Staged install across the available area (sample)
Testing, interconnection and handover (sample)
Gallery
Photographs below are stand-ins until the client provides project photos.